Victorian Resources Online (archived)
Archived content — This page contains material from the Victorian Resources Online (VRO) website. It is no longer maintained and is provided for reference only. This content is hosted by CeRDI and is not endorsed by Agriculture Victoria.

Sitemap

Slide 6B

Slide:  Slide 6b
Further down the gully this structure was built from split ’44 gallon’ drums. Water flowed through a road culvert and down the structure. It lost energy on a rock bar on the gully floor. It was built around 1963 and at that stage the gully was 7.5 metres deep at this point.