Victorian Resources Online (archived)
Archived content — This page contains material from the Victorian Resources Online (VRO) website. It is no longer maintained and is provided for reference only. This content is hosted by CeRDI and is not endorsed by Agriculture Victoria.

Sitemap

Slide 6D

Slide:  Slide 6d
In 1963 this stone structure was buildt by pouring concrete over loose stones. The gully depth as this point was 6 metres. A large hole exists at the top of the structure and allows water to flow beneath the structure. This will eventually cause the structures collapse if not repaired. Structures are very costly to build and maintain.